StrataCare Bowenhills
with
Schneider Electric EV Charging Solution
EVlink Pro AC 22kW Chargers

StrataCare Bowenhills
a fully integrated EV charging solution
For this project, Planit Charge was engaged to commission and deliver a fully integrated EV charging solution in collaboration with our trusted partners.
Working alongside Fullywired, who carried out high-quality onsite installation, and CNW Electrical Wholesale Archerfield, who provided exceptional supply support, we ensured the chargers were seamlessly deployed and made ready for immediate use.
At the heart of the installation are the Schneider EVlink Pro AC 22 kW chargers with tethered cables. These industry-leading chargers are designed for commercial and multi-residential environments, offering:
- Fast AC charging up to 22 kW, reducing dwell times and maximising availability.
- Built-in connectivity for smart load management and integration with site infrastructure.
- Durable design for reliability in high-use, real-world conditions.
- Tethered Type 2 cables, making them easy and convenient for drivers.
Scope of Works included:
- Programming and commissioning of the Schneider EVlink Pro AC units.
- Integration with the site’s existing electrical infrastructure, ensuring stable and reliable performance.
- Testing and verification of load management functionality and communications.
- Final driver-ready configuration, enabling seamless “plug in and go” charging.




Outcome
This project represents more than just installing new hardware – it’s part of the broader movement to make EV charging accessible, reliable, and future-focused across commercial and community spaces.
Request A Demo and/or Information Pack
